Company and Industry News
A water department’s proactive approach to infrastructure and reliability
When the failure occurred, Tucson Water employees were in a hurry to figure...
Full StoryBaker Hughes: US rig count up 2 units to 455
The US drilling rig count increased by 2 units to reach 455 rigs working for...
Full StoryDakota Access to continue operations during environmental review
Energy Transfer LP’s 570,000-b/d Dakota Access pipeline will continue to...
Full StoryBaker Hughes: US rig count up 5 units to 453
The US drilling rig count increased by 5 units to reach 453 rigs working for...
Full StoryEnbridge keeps Line 5 pipeline operating amid court fight over shutdown order
Enbridge Inc. kept its Line 5 crude oil pipeline operating May 12 as the...
Full StoryRusted Rubis tank leaked over 3,686 gallons of diesel
A rusty storage tank at Jackson Point suffered a “bottom plate failure...
Full StoryBaker Hughes: US rig count up 8 units to 448
The US drilling rig count increased by 8 units to reach 448 rigs working for...
Full Story