Arkansas Power & Light Company, Little Rock, AR

The photo is from existing 345kV and 500kV guyed tower foundations. Structures on the left are on a new 500kV circuit and those on the right are on a 20 year old 345kV circuit. Structure-to-soil potential measurements on guyed anchors and tower foundations on the 345kV circuit showed that...

American Airlines Alliance M&E Base, Fort Worth, TX

This was a 2 1/2 year, $400 million, fast track design-build project to construct a modern wide bodied jet aircraft maintenance facility. Prepare a design criteria manual, guide specifications and design for an integrated cathodic protection system at the maintenance base. Responsible for...

Bridgeline Gas Distribution Company, New Orleans, LA

A recently installed supervisory control and data acquisition (SCADA) system was experiencing repeated lightning and/or power line surge failures. Failures occurred as frequently as once a week during lightning storm activity at a few of the sites. In some instances, entire printed circuit (PC)...

Burke Royalty Company, Wichita Falls, TX

Wells in this field were drilled to the 5,000 to 6,000 foot range. One well had already required workover due to a casing corrosion failure. Probable cause of the casing failure was soil instigated corrosion of the well casing in a corrosive interval. Cathodic protection was an economical and...

Dallas Area Rapid Transit (DART) Dallas, TX

Construction of approximately 20 miles of dual track Light Rail Transit comprising the "Starter System." During system construction ELK performed corrosion control acceptance tests which included water line cathodic protection, protective coatings, electrical continuity, electrical grounding and...

Induced A C Studies

In the last three to four decades, the incidence of joint occupancy of the same right-of-way by one or more pipelines and power lines has increased. Such joint use produces significant induced AC effects on the influenced pipelines. These effects may create electrical hazards to pipeline facilitiesa

Sulfur Recovery Plant for Major Oil Company, Santa Barbara, CA

On-site coating inspection services for the project. The project specification consisted of three coat system, involving inorganic zinc primer, followed by an aliphatic polyurethane midcoat, with a final coat of polyamide epoxy for all skids and uninsulated piping. There is an estimated 5 miles...

Toulene Remediation Process Train for Plant Wastewater

Client requested a change in metallurgy for improved corrosion resistance. A large Type 316L Stainless Steel (SS) shell and tube heat exchanger had been in service for 3½ years and was in the process of being re-tubed for the third time! Severe erosion corrosion was occurring over most of the SS...